Evidence
Interface & evidence
A real surface area—not a mock. Scroll the story below for constraint, build, and outcome.
Story arc
How this shipped
End-to-end solutions from database to deploymentThree beats: what pressed against the work, how the stack answered, and what changed once it was live.
I · Constraint
The brief
Emerging commerce protocols have no off-the-shelf uptime monitoring. Agencies need to monitor client endpoints without rolling their own infra.
II · Build
The craft
Built UCP validator (10KB engine), store management API, monitoring cron (runs every 5 min), Stripe checkout, and white-label reports. Vercel cron + Stripe automation. All 27 env vars configured.
III · Proof
What moved after launch
Pre-launch. Validator engine + cron + Stripe flow shipped. White-label report templates ready for agency tier. Cron endpoint verified working (200 OK).
Inventory
